American Water Heater VG6250T100 Benutzerhandbuch

Seite von 60
28
5.  Secure  assembly  to  roof  structure  as  shown  in  Figure  23 
using  field  supplied  metal  strapping  or  equivalent  support 
material.
note: ensure termination height is above the roof surface 
or anticipated snow level as shown in figure 23.
6.  Install  rain  cap  and  small  diameter  pipe  assembly  in 
roof  penetration  assembly,  Ensure  small  diameter 
pipe  is  cemented  and  bottomed  in  Y  concentric  fitting. 
7.  Cement water heater combustion air intake and vent pipes to  
concentric  vent  termination  assembly.  See  Figure  23  for  
proper pipe attachment.
8.  Operate heater through 1 heat cycle to ensure combustion 
air and vent pipes are properly connected to concentric vent 
termination connections.
flat roof InstallatIon
When installing a concentric termination vertically through a flat 
roof, the termination’s vent cap must be a minimum of 10 feet (3 
m) away from any parapet, vertical wall or structure as shown 
in Figure 23A.
If this required 10 foot (3 m) distance to a parapet, vertical wall 
or structure cannot be maintained, standard terminations must 
be used. See Vertical Termination Installation.
CONCENTRIC TERMINATION(S)
MUST BE A MINIMUM OF 10 FEET
(3 m) AWAY FROM ANY PARAPET,
VERTICAL WALL OR 
STRUCTURE.
CONCENTRIC TERMINATION
FLAT ROOF CLEARANCE
fIGure 23a.
procedure 2 sIde wall terMInatIon, see fIGure 24.
fIGure 24.
1.  Determine best location for termination kit.
NOTE:  Consideration  for  the  following  should  be  used  when 
determining an appropriate location for the termination kit:
•  Termination kit positioned where the vent vapors will not damage 
plants/shrubs or air conditioning equipment. 
•  Termination kit positioned so it will not be affected by wind eddy 
that may allow recirculation of combustion products, or airborne 
leaves, or light snow.
•  Termination  kit  positioned  where  it  will  not  get  damaged  or  be 
subjected to foreign objects, such as stones, balls, etc. 
•  Termination  kit  positioned  where  the  vent  vapors  will  not  be 
objectionable. 
 
note: see the venting information (starting on page 20) in 
this manual for additional vent location requirements.
2.  Cut 1 hole (5 in. diameter)
3.  Partially  assemble  concentric  vent  termination  kit.   
  a)  Cement  the  Y  concentric  fitting  to  larger  diameter  
kit pipe, see Figure 19.
  b)  Cement  the  rain  cap  to  the  smaller  diameter  kit  
pipe, see Figure 22.
note: Instead of cementing the smaller pipe to the rain cap, a 
field-supplied stainless steel screw may be used to secure the 
2 components together when field disassembly is desired for 
cleaning, see figure 22.
when using alternate screw assembly method, drill clearance 
hole in rain cap and pilot hole in vent pipe for screw being 
used. failure to drill adequate holes may cause cracking of pvc 
components, allowing combustion products to be recirculated. 
failure to follow this warning could result in personal injury 
or death.
do not operate the heater with rain cap removed or 
recirculation of combustion products may occur.  water may 
also collect inside larger combustion-air pipe and flow to the 
burner enclosure. failure to follow this warning could result 
in product damage or improper operation, personal injury 
or death.
4.  Install  Y  concentric  fitting  and  pipe  assembly  through  
  structure’s hole.
note: do not allow insulation or other materials to accumulate 
inside pipe assembly when installing through hole.