TROUBLESHOOTING
SEQUENCE OF OPERATION
Read  the  Sequence  of  Operation  below  before  attempting  to 
correct any operational problems. See the Sequence Of Operation 
Flow Chart.
1.  When the control system is first powered, during boot up, the 
blower will run momentarily and stop, and the control system 
will display water heater model information during initialization. 
After a few moments the control system LCD which is part of 
the UIM (user interface module) will display the default screen 
known as the Desktop screen.
2.  If the control system determines that the actual water temperature 
inside the tank is below the programmed Operating Set Point 
minus the Differential setting, a heating cycle is activated.
3.  The control system then performs selected diagnostic system 
checks. This includes confirming the blocked exhaust, blocked 
intake  and  ECO  (energy  cut  out)  switch  contacts  are  closed. 
The Blower Prover Switch contacts are confirmed open.
4.  If  all  diagnostic  checks  are  successfully  passed,  the  control 
system energizes the Combustion Blower for pre-purge.
5.  The  control  system  must  confirm  the  Blower  Prover  Switch 
contacts close after the Combustion Blower is energized.
6.  If the Blower Prover Switch contacts are confirmed closed the 
control system energizes the spark igniter.
7.  After a few seconds, the control system energizes the 24V Gas 
Control Valve allowing gas to flow to the Main Burner. 
8.  The control system de-energizes the spark igniter.
9.  The control system monitors the flame sensor to confirm a flame 
is present at the Main Burner. If a flame is not verified during the 
ignition trial period the control system will try for ignition up to 
two more times. If flame can not be verified after three trials for 
ignition, the control system will lock out and display the Ignition 
Failure Fault message.
10. If a flame is verified, the control system will enter the heating 
mode where it will continue heating the water until the Operating 
Set Point is reached. At this point, the control system will de-
energize the 24 V Gas Control Valve and enter the post-purge 
cycle (60 seconds).
11. The  Combustion  Blower  will  run  for  the  duration  of  the  post-
purge cycle to purge the water heater of all combustion gases. 
When  the  post-purge  cycle  is  complete,  the  blower  is  de-
energized and will coast to a stop.
12. The  control  system  now  enters  the  standby  mode  while 
continuing to monitor the internal storage tank water temperature 
and the state of other system devices. If the tank temperature 
drops  below  the  Operating  Set  Point  minus  the  Differential 
setting, the control will automatically return to Step 2 and repeat 
the operating cycle.
INSTALLATION CHECKLIST
The  list  below  represents  some  of  the  most  critical  installation 
requirements  that,  when  overlooked,  often  result  in  operational 
problems, down time and needless parts replacement. This is not 
a complete list. Before performing any troubleshooting procedures 
use the list below to check for installation errors. Costs to correct 
installation  errors  are  not  covered  under  the  limited  warranty. 
Ensure all installation requirements and instructions in this manual 
have been maintained and followed.
WATER HEATER LOCATION
1.  Ensure proper clearances to combustibles are maintained and 
there is sufficient room to service the water heater.
2.  Ensure the area is free of corrosive elements and flammable 
materials.
VENTING
3.  Ensure the intake air and/or vent (exhaust) piping is the correct 
size for the installed length.
4.  Ensure  the  maximum  equivalent  feet  of  pipe  has  not  been 
exceeded for the intake air and/or vent pipe.
5.  Ensure the maximum number of elbows has not been exceeded 
in the intake air and/or vent pipe.
6.  Ensure  all  exterior  clearances  for  the  intake  air,  vent  and 
concentric terminations are maintained. These clearances and 
those cited by local and national codes must be maintained.
7.  If venting direct vent, ensure the screen located in air intake at 
the water heater was removed.
GAS SUPPLY AND PIPING
8.  Ensure  the  supply  gas  line  to  each  water  heater  meets  the 
minimum supply gas line size requirements.
CONDENSATE DRAIN
9.  Ensure  the  condensate  drain  is  properly  connected  to  the 
exhaust elbow on the water heater with a water trap to prevent 
vent gases from escaping into the installed space and draining 
freely to a suitable floor drain.
ELECTRICAL CONNECTIONS
10. Ensure the water heater is properly grounded. Flame sensing 
requires an adequate earth ground. If the water heater is not 
properly grounded it will cause Ignition Failure.