Haier 3150 SB Benutzerhandbuch

Seite von 40
Maintenance 
12
310622L
Preventive Maintenance Schedule
Establish a preventive maintenance schedule based on 
the pump’s service history. This is especially important 
for prevention of spills or leakage due to diaphragm
failure.
The following is a list of recommended maintenance 
procedures and frequencies to operate your equipment 
safely. Maintenance must be performed by trained per-
sonnel per this schedule to assure safety and reliability 
of the equipment.
Operator
Maintenance Person
Task
Daily
Weekly
Monthly
Inspect system for leaks
Depressurize fluid, after 
operation
Remove heat from system, 
after operation
Inspect diaphragm for wear
Inspect check valve compo-
nents for wear
Check hoses for wear
Check/tighten fluid connec-
tions
Check/tighten air connec-
tions
Lubricate air valves