•  Install  the  bearing  cone  (5.03)  and  the  bearing  pre-load 
spacer (5.05) secure using the M12 screws (5.20) see Figure 
48  for  the  correct  order  to  tightening  the  screws  also  see 
section 6.2 for torque settings.
4.2.2 ROllING TORQUE /  
PRE-lOad
Use a torque meter to check the rolling torque see section 6.2 
for torque settings
The  rolling  torque  as  standard  with  new  components  will  be 
under the required amount and will require adjustment.
•  To adjust the pre-load modify the size of the bearing pre-load 
adjustment spacer (4.10)
NOTE: When machining the spacer make sure small cuts are 
taken i.e. 0.02 mm – 0.03 
4.2.3 fINal PRE-lOad assEMblY
•  When the pre-load is set remove the bearing pre-load spacer 
(5.05) and install the front lip-seals (5.11) – refer to lip-seal 
setting distances section 6.3
•  Install  the  gearbox  O-ring  (5.22)  and  secure  the  pre-load 
spacer (5.05) with the M12 screws (5.20) see Figure 48 for 
the correct order to tightening the screws also see section 
6.2 for torque settings.
4.2.4 TIMING  – MUlTIlObE ROTORs 
ONlY
•  To  set  the  timing  marks  on  the  gears  (5.06)  lay  the  gears 
next to each other and line up the keyways, You can now 
punch three timing marks to show the correct alignment of 
the gears see Figure 52