Phase Technology CI-6.0 IX QM Merkblatt

Seite von 2
T E C H N O L O G Y
CI-6.0 IX QM
Install instructions for CI round flush mount models:
Universal flange & grille
assembly (CI-FGR QM)
(purchase separately)
Grille
Flange clamp (4x)
The CI-FGR QM will clamp 
material up to 1 
1
/
2
” thick.
Baffle clamp screw (4x)
Flange clamp 
screw (4x)
218-1240
Choose the appropriate mounting location for each speaker.
When deciding upon a location, consider the following:
   • Make certain your speaker wires can be run to or are accessible from these 
       locations.
   • Make certain the wall or ceiling material is sturdy enough to support the 
       weight and vibration of the speakers.
   • It is recommended that our pre-construction rough-in brackets (part number
      RB-17*) be used whenever possible in new construction. A back box (part
      number BB-12) is also available.
   • Make certain the area behind the speaker is free of obstacles such as wall 
       studs, electrical wiring, pipes, etc.
   • Each speaker should be positioned properly, relative to the listening area 
       for good coverage.
   • Audio performance and room-to-room isolation will be improved if there is 
       some fiberglass insulation placed loosely behind the speaker.
*The RB-17 rough-in bracket is available for installations in new construction.
8650 College Boulevard  |  Overland Park, KS 66210   |  (888)phase tk   |  www.phasetech.com  |  www.mseaudio.com
Thank you for purchasing Phase Technology Custom Installation 
speakers. Before installing, please read through this installation
manual thoroughly.
Speaker/baffle 
assembly 
Speaker 
installation tool