Garmin GTN6XX Benutzerhandbuch

Seite von 160
190-01007-A1
System Maintenance Manual GTN 6XX/7XX Part 23 AML STC
Rev. 7
Page 4-2
4.3 Maintenance Intervals
Table 4-1. Periodic Maintenance
Item
Description/Procedure
Interval
Equipment Removal 
and Replacement
Removal and replacement of the following items. See Section 6 
of this document for instructions.
• GTN 6XX/7XX, Flight Stream 210, or GMA 35 units
• NAV antenna cable splitter
• NAV antenna cable diplexer
• Fan
On Condition
Cleaning the Front 
Panel
The front bezel, keypad, and display can be cleaned with a soft 
cotton cloth dampened with clean water. DO NOT use any 
chemical-cleaning agents. Care should be taken to avoid 
scratching the surface of the display.
On Condition
Display Backlight
The display backlight LEDs are rated by the manufacturer as 
having a usable life of at least 36,000 hours. This life may be 
more or less than the rated time depending on the operating 
conditions of the GTN. Over time, the backlight lamp may dim 
and the display may not perform as well in direct sunlight 
conditions. The user must determine by observation when the 
display brightness is not suitable for its intended use. Contact the 
Garmin factory repair station when the backlight lamp requires 
service.
On Condition
Battery 
Replacement
The GTN has an internal keep-alive battery that will last about 10 
years. The battery is used for GPS system information. Regular 
planned replacement is not necessary. The GTN will display a 
‘low battery’ message when replacement is required. Once the 
low battery message is displayed, the battery should be replaced 
within 1 to 2 months.
If the battery is not replaced and becomes totally discharged, the 
GTN unit will remain fully operational, but the GPS signal 
acquisition time may be increased. There is no loss of function or 
accuracy of the GTN unit with a dead battery.
The battery must be replaced by the Garmin factory repair 
station or factory authorized repair station.
On Condition
Test - Bonding 
Check 
Perform an electrical bonding check of the GTN, GMA 35 
(if installed), and Flight Stream 210 (if installed) per Section 4.5.
Every 10 
years or 2000 
flight hours, 
whichever 
comes first.
Test TVS Lightning 
Protection
The GTN #1 main power input will have a TVS located at the 
LRU, for 
IFR non-metallic aircraft only. The TVS must be 
checked or replaced in accordance with Section 4.6.1.
24 Calendar 
Months