IBM 343 Benutzerhandbuch

Seite von 187
66 
xSeries 343 Hardware Maintenance Manual 
Working Inside the System 
This section presents the following procedures that describe removal and installation of most
components inside the system.
Safety:  Before You Remove Server Covers 
Before removing covers at any time to work inside the system, observe these safety guidelines.
1. Turn off all peripheral devices connected to the system.
2. Power down the system by pressing and holding the Power button on the front of the chassis for
several seconds. After the server shuts down disconnect the DC power to remove standby
power from the server.
3. Label and disconnect all peripheral cables and all telecommunication lines connected to
I/O connectors or ports on the back of the system.
Provide electrostatic discharge (ESD) protection by wearing an anti-static wrist strap attached to
chassis ground of the system-any unpainted metal surface-when handling components.
Caution and Danger Statements 
Caution and danger statements apply whenever you remove covers of the system. Only a
technically qualified person should integrate, configure, or service the system.
Statement 14 
 
CAUTION 
Hazardous voltage, current, and energy levels might be present. Only a qualified
service technician is authorized to remove the covers where the following label is
attached.