Grizzly g0669X Benutzerhandbuch

Seite von 76
-18-
g0669X precision 10" x 54" Vs Milling Machine
Assembly
tools Needed ............................................... Qty
snap ring pliers ................................................ 1
hex Wrench 4mm .............................................. 1
Wrench 14mm ................................................... 1
phillips screwdriver ........................................... 1
standard screwdriver ........................................ 1
to assemble the mill:
1.  Move  the  head  to  an  upright  position  (refer 
to 
Head Movement on Page 27 for detailed 
instructions).
2.  thread a handle onto the vertical crank and 
use the 14mm wrench to fully tighten it.
3.  Use the snap ring pliers to remove the retain-
ing ring from the vertical crank leadscrew (see 
figure 12), slide the crank on the leadscrew, 
then replace the retaining ring.
4.  Use the vertical crank to raise the knee until 
you can position the splash pan on the base, 
then secure the pan in place with the two cap 
screws, as shown in 
figure 13.
figure 13. splash pan installed (left side 
shown).
Cap screw
(1 of 2)
5.  thread the remaining handles onto the three 
ball  handles  and  use  the  14mm  wrench  to 
fully tighten them (see 
figure 14).
figure 12. Vertical crank installed.
retaining ring
handle
Crank
figure 14. handle installed on ball handle.
handle