Grizzly g0669X Benutzerhandbuch

Seite von 76
g0669X precision 10" x 54" Vs Milling Machine
-23-
16.  start spindle rotation.
17.  test  the  variable  speed  dial  by  turning  the 
speed all the way up for a few seconds, then 
turning it all the way down.
18.  point the coolant nozzle onto the table, turn 
the  coolant  pump  switch  to  "
l"  or  ON,  then 
check for proper operation of the coolant sys-
tem.
19.  Use  the  vertical  power  feed  buttons  on  the 
control panel to raise and lower the knee to 
make sure the vertical limit stops (right side 
of knee) are working properly.
20.  set  the  longitudinal  limit  stops  and  test  the 
longitudinal  power  feed  for  proper  operation 
(see 
Longitudinal Power feed on Page 26 
for detailed instructions).
When all of the 
test Run procedures are success-
fully completed, proceed to 
Spindle break-In.
Spindle break-In
NOTICE
Successfully complete the spindle break-in 
procedure  to  avoid  rapid  wear  of  spindle 
components when placed into operation.
3.  turn the machine ON, start spindle rotation, 
then adjust the spindle speed dial for approxi-
mately 280 rpM.
4.  Let the mill run at this speed for 20 minutes, 
then  turn  the  spindle 
OFF  and  wait  for  it  to 
stop.
5.  Use the spindle direction switch on the con-
trol panel to reverse the spindle direction and 
start the spindle rotation, then let the mill run 
for another 20 minutes.
6.  turn the spindle OFF and wait for it to stop, 
then move the spindle speed range selector 
to  the  high  position  and  start  spindle  rota-
tion.
7.  set the spindle speed at approximately 2100 
rpM, then repeat 
Steps 4–5.
8.  turn  the  mill  OFF.  the  spindle  break-in  is 
now  complete  and  the  machine  is  ready  for 
operation.
For  your  convenience,  the  adjustments  listed 
below have been performed at the factory.  
however, because of the many variables involved 
with  shipping,  we  recommend  that  you  at  least 
verify the following adjustments to ensure the best 
possible results from your new machine.
step-by-step  instructions  for  these  adjustments 
can be found in the 
SERVICE section starting on 
Page 43.
factory adjustments that should be verified:
1.  gib adjustment (Page 46).
2.  Leadscrew backlash adjustment (Page 47).
Recommended 
Adjustments
it is essential to closely follow the proper break-in 
procedures to ensure trouble-free performance of 
your mill.
to perform the spindle break-in procedure:
1.  after  successfully  completing  the  test  Run 
procedures, make sure the mill is turned 
OFF 
and the spindle is stopped.
2.  Move the spindle speed range selector to the 
LoW  position  (refer  to 
Selecting  Spindle 
Speed Range on Page 30 for detailed instruc-
tions).