Installing the D400 
This chapter covers the following topics: 
•  Overview of the steps and tools required to install the D400 
•  Tour of the product features 
•  How to physically install the D400 in a rack or substation panel 
CAUTION:  Before you install and operate the D400, read and follow the safety guidelines 
and instructions in section “1.1 Safety Precautions” 
2.1 Installation 
Steps 
The installation procedure will vary depending on the components ordered and shipped 
with your D400. Follow the procedures in this manual that apply to the specific hardware 
configuration of your D400.  
» 
Follow these main steps to install and set up the D400: 
1. 
Mount the D400 in the rack or panel. See section “2.5 Physical Installation”. 
2. 
Set up the communication cards. See chapter “3 Setting up Communication Cards”. 
3. 
Make device and network connections. See chapter “4 Connecting to Devices and 
Networks”. 
4. 
Make power connections and verify operation. See chapter “5 Powering Up the 
D400”. 
5. 
Install the supplied battery on the D400 main board. See chapter “7.2 Replacing the 
Battery”. 
6. 
Set up communications with the D400. See chapter “6 Configuring the D400”.