Sun StorEdge 3900 and 6900 Series Troubleshooting Guide • March 2002
To Isolate the A1/B1 FC Link
1. Quiesce the I/O on the A1/B1 FC link path.
2. Run
switchtest
or
qlctest
to test the entire link.
3. Break the connection by uncabling the link.
4. Insert a loopback connector into the switch port.
5. Rerun
switchtest
.
a. If
switchtest
fails, replace the GBIC and rerun
switchtest.
b. If
switchtest
fails again, replace the switch.
6. Insert a loopback connector into the HBA.
7. Run
qlctest
.
If the test fails, replace the HBA.
If the test passes, replace the cable.
8. Recable the entire link.
9. Run
switchtest
or
qlctest
to validate the fix.
10. Return the path to production.