Spectralink 1728 Benutzerhandbuch

Seite von 64
S
PECTRA
 S
ERIES
 
  7
PART 2: INSTALLATION
2.1
LOCATION AND MOUNTING
Before mounting the cabinet, push the five white nylon mounting studs into the back of the cabinet. Pull all cables
into the cabinet and prepare them for connection before mounting the circuit board into the back of the cabinet.
Select an installation site that isn't easily accessible to intruders and leave at least 2in. (5cm) around the panel box
to permit adequate ventilation and heat dissipation. The installation site should be dry and close to an AC source,
ground connection and telephone line connection.
Figure 2.1:  Spectra 1738EX and 1738 Control Panel Overview
For the keypad’s zone, EOL and 
tamper configurations, refer to 
Configuring The LED Keypads on 
page 14.