Gateway ALR 9200 Benutzerhandbuch

Seite von 226
42    Maintaining and Troubleshooting the Gateway ALR 9200 Server
1.
Observe the safety and ESD precautions in “Static Electricity 
Precautions” on page 2.
2.
Remove the memory module and place it component-side up on a 
nonconductive, static-free surface (see “Removing the Memory 
Module” on page 40)
.
3.
Gently push the plastic ejector levers out and down to eject a DIMM 
from its socket.
4.
Hold the DIMM only by its edges, being careful not to touch its 
components or gold edge connectors. Carefully lift it away from the 
socket and store it in an antistatic package.
5.
Repeat steps 3 and 4 to remove other DIMMs as necessary.
If you are replacing DIMMs, proceed to “Installing DIMMs” on 
page 43. If y
ou are removing DIMMs, continue this procedure.
6.
7.
Reinstall the foam cover.
8.
Reinstall the access cover using the original screws.
9.
Connect all external cables and power cords to the system.
10.
Turn on the monitor and then the system.
11.
Run the SSU/BIOS Setup (see “Advanced Chipset Control Submenu” 
on page 91 and “Res
ource Configuration Add-in Window” on 
page 112) t
o configure the system and to properly set up advanced 
memory attributes as required.
To Remove DIMMs
 Caution!
Use extreme care when 
removing a DIMM. Too 
much pressure can damage 
the socket. Apply only 
enough pressure on the 
plastic ejector levers to 
release the DIMM.
3424.boo  Page 42  Wednesday, September 2, 1998  9:23 AM