GE PMCS 6.15 Benutzerhandbuch

Seite von 72
 
Building the Power-Monitoring Network in 
NetBuilder 
When Network Builder is running, you can begin configuring your EPM system 
by adding a site to the workstation, then adding devices to the site.  For larger 
systems multiple sites are added; one for each network of devices monitored. 
NOTEThe PMCS installation wizard creates initial entries for the workstation 
and software nodes. If you do not need to make changes to the information 
provided during installation, skip this section and begin with the section title 
"Adding an Ethernet Site". 
Adding a Workstation 
When you use the PMCS installation wizard to install a Primary node or Full 
Station Secondary node, it creates a Workstation in the Network Configuration 
for you. Stationless Secondary nodes do not appear in the network configuration 
as workstations, but as software nodes under the Primary workstation. See the 
section on software nodes for more information.  
To add a new workstation, right click “System” and choose “Insert 
Workstation” from the pop-up menu. The  “System – Add Workstation” dialog 
box appears as shown below. Type the network name of the computer in the 
“Name” field. (Use the default settings on the “Advanced” tab.) Click “OK, then 
proceed to “Adding Software Nodes” below. 
 
CIMPLICITY PMCS Read-This-Book-First 
EPM Device-Special Considerations  
  61