Nortel Networks NN44200-300 Benutzerhandbuch

Seite von 64
24
Chapter 3 Preparing for installation
Step
Description
Check
2
Unpack the server, and ensure you have all the items you need (see
Complete the following checklists that are provided in the Installation and
Configuration Task List 
(NN44200-306):
"CallPilot software media and documentation checklist"
"CallPilot server hardware checklist"
3
Remove the front bezel and server cover, and inspect the interior (see pages
and
).
4
Replace the server cover.
5
Install the power supply modules in the server (see
6
For a DC-powered server, set up the DC power source (see
7
Place the 1002rp server in the chosen location (see
8
Replace the front bezel (see page
9
Set the DIP switches on the modem (see
).
Connect the 1002rp server and devices as follows:
Connect the monitor, keyboard, and mouse (see
Connect the modem (see
Connect the 1002rp server to the ELAN hub or switch (Meridian 1 or
Communication Server 1000 only) (see
).
ATTENTION
To comply with EMC radiation requirements, a Class A hub must be
located 10 m (33 ft.) away from the 1002rp server. Shielded Ethernet
cables must be used.
10
Nortel CallPilot
1002rp Server Hardware Installation
NN44200-300
01.01
Standard
5.0
23 February 2007
Copyright © 2007, Nortel Networks
Nortel Networks Confidential
.