Nortel Networks NN43001-318 Benutzerhandbuch

Seite von 108
Installation procedures
57
secondary reference clock. These reference clock sources are
derived from either BRI spans or DSLs (DSL 0 and/or DSL 1).
Note 2: A clock controller is required in every cabinet or MG
1000S that contains a digital trunk.
5
Install the SILCs and UILCs. See
.
6
Remove the SILCS and UILCs, if previously installed. See
7
Install the PRI hardware. See
Note: This step is required for packet data implementation only.
8
Connect the ISDN BRI terminals or trunks.
a. Connect the ISDN BRI terminals for line applications:
1. Connect system cables to the cross-connect terminal.
See
2. Cross-connect the DSLs at the cross-connect terminal.
See
3. Connect the terminating resistor to the SILC DSL. See
4. Connect the ISDN BRI terminals to the DSL. See
5. Initialize a Nortel Networks M5317TDX terminal. See
.
b. Connect the ISDN BRI trunks for trunking applications:
1. Connect the system cables to the cross-connect terminal.
See
2. Cross-connect the DSLs at the cross-connect terminal. See
.
Nortel Communication Server 1000
ISDN Basic Rate Interface Installation and Commissioning
NN43001-318
01.02
Standard
Release 5.0
20 June 2007
Copyright © 2003-2007, Nortel Networks
.