Fuji Bikes UG230H-SS4x Benutzerhandbuch

Seite von 124
6
1. Operational Procedures
6-1
P
1.
Operational Procedures
POD Operation
Follow the procedure below to operate the POD.
1.
Installation and wiring
For details, refer to Chapter 3.
2.
Connection with devices including a PLC and a temperature controller
For instructions and precautions on wiring between the POD and other devices, refer to the 
separate User’s Manual <PLC Connection> (FEH380).
3.
POD power-on
• New POD
• Other than the above
When the check screen below and then the next user screen are displayed correctly, go to 
step 5.
4.
Screen data creation and transfer
• New POD
• Other than the above
Refer to Chapter 5, “Data Transference” in User’s Manual <Operation> (FEH375).
5.
Operation start
The POD becomes operable with a PLC or a computer connected to it.
* If the POD does not operate normally and shows an error message, eliminate the cause by