Step One: Plan your setup
An EPC/X system can be set up in a variety of ways. Before you start 
your installation, be sure of the following:
Number of components. 
You can connect up to fourteen concentrators 
and Xem modules onto one EPC/X host adapter (using both lines). It 
is a good idea to balance the number of connections on each line. 
Having 12 concentrators and modules on one line, and 2 on the other, 
for example, may not make the best use of line resource.
Location of components. 
Using the cables that come with the product, 
concentrators can be located up to ten feet apart. (The daisy-chain 
cable that comes with each Xem module allows it to be stacked on top 
of the concentrator to which it is attached via the EBI connector.)
If your installation calls for greater distances between concentrators, 
you can use twisted pair cabling in a maximum cumulative length of 
up to 2000 feet (600 meters) from the host adapter.
Note:
The length of twisted pair cabling affects the maximum data 
transfer rate that can be expected over the cable. The longer 
the length, the lower the rate. To maintain a baud rate of 10 
Mbaud, the maximum cumulative twisted pair cable length 
cannot exceed 30 feet (9 meters).
You can also use fiber optic cable (a special fiber optic conversion 
option is available from Digi) that will allow a distance of up to 1.2 
miles (2000 meters) from the adapter.
For even greater distances, you can attach a synchronous modem 
directly to the adapter, and remotely locate concentrators and Xem 
modules to a second synchronous modem.
Cabling. 
Before beginning the installation, be sure that you have the 
cables that you will need for the distances between concentrators, as 
well as cables for the peripherals that you will be attaching to the con-
centrators and Xem modules. EPC/X system concentrators and 
PORTS/Xem modules are available with RJ-45 or DB-25 connectors 
for peripheral cabling. You will need to be sure that you have cables 
of the correct length and with the right connectors to properly attach 
the devices you want to use with each concentrator or Xem module.
Power Requirements. 
Each EPC/CON-16 concentrator (and 
Modem/Xem module) requires its own power supply. Before pro-
ceeding with installation, you should verify that adequate line power 
is available where each concentrator (and Modem/Xem) will be 
installed. Note that PORTS/Xem modules do not require power sup-
plies when attached to an EPC/CON-16 concentrator.
Additional information about the options available with the EPC/X 
system, such as specifications and cabling details, is provided on the 
CD-ROM that is packaged with the host adapter.
Step Two: Install the EPC/X PCI host adapter
Before installing the EPC/X host adapter, you should do the following:
Wear an ESD wrist strap to ground yourself while handling the 
adapter. If one is not available, discharge static electricity from your 
body by touching an unpainted metal surface, such as the computer’s 
chassis, prior to handling the adapter.
Record the adapter serial number, which will enable Digi to provide 
you with better service, should the need arise. 
The serial number label has this general format: 
S/N: (S) XXX XXXXX
Unplug power from the PC.
1. Remove the computer’s cover.
2. Locate an available PCI slot in your computer and remove the slot 
plate.
3. Insert the adapter into the slot and screw the endplate to the computer 
chassis. The endplate must be screwed into the computer chassis to 
remain in compliance with Part 15 of FCC rules.
4. Replace the computer’s cover.
5. Attach an EIA-422 cable to the connector of each line you will use on 
the adapter.
Step Three: Install concentrators and add-ons
1. Position concentrators and Xem modules (if any) at the location you 
have prepared according to the plan you developed in 
Step One
.
2. Attach the cable from line l on the adapter to the connector labelled 
HOST ADAPTER
 on the first concentrator of the chain that is to be 
connected to Line 1. 
Figure 45. 
Side Panel of EPC/CON-16 module
If you are cabling multiple concentrators together, attach another 
cable to the 
REMOTE
 connector of the first concentrator. Connect this 
cable to the 
HOST
 
ADAPTER
 connector of the second concentrator. 
Continue cabling until all concentrators in the chain are connected. 
3. Install a terminator plug in the 
REMOTE
 connector of the last concen-
trator in the chain. 
4. Repeat steps 2 and 3 for Line 2 on the adapter (if you are using it).
5. To cable PORTS/Xem or Modem/Xem modules to the EBI bus of a 
concentrator, attach one end of an EBI cable to the 
EBI OUT
 connec-
tor on a concentrator and the other end to the 
EBI IN
 connector on the 
add-on module. Continue similarly using the 
EBI IN
 and 
EBI OUT
 
connectors on the add-on modules until all the add-ons for a concen-
trator are cabled together.
6. Attach power supplies to the concentrators (and Modem/Xem mod-
ules).
7. Turn on power to the unit(s).
Step Four: Set the node numbers
Each concentrator must have a unique node number so the adapter can 
recognize it on the chain. In general, you should set the node number of a 
concentrator according to its relative position in the chain. For example, 
the concentrator closest to the adapter would be node 1, the second would 
be node 2, and so on. To set the node number, do the following:
1. Wait until you see 
P1
 displayed on the front panel of the unit (about 
30 seconds after you power on the unit). This indicates that the 
Power-on Self Test has successfully completed.
2. Press the right arrow button once to display the current node number. 
(
1n
 is the default.)
3. Press the left arrow button to increment the node number. Node num-
bers go up to 
8n
 and then return to 
1n
.
4. To save the node number currently displayed on the front panel, press 
the right arrow button once. If the number was successfully saved to 
EEPROM, the display will read 
Pn