Toshiba S4 Benutzerhandbuch

Seite von 470
4.23  FP board
4 Replacement Procedures
TECRA S3 Maintenance Manual (960-532)
[CONFIDENTIAL]
4-57
Installing the FP board
To install the FP board, follow the steps below and refer to Figure 4-40.
1.  Connect the FP cable to the connector CN950 on the FP board.
2.  Install the FP board in place and secure it with the following screws.
•  M2×3S
S-FLAT HEAD screw
×2
3.  Stick the glass tape on the FP cable.