Site Preparation
Site Preparation Checklist for EX2200 Switches
The checklist in Table 15 on page 33 summarizes the tasks you need to perform when
preparing a site for EX2200 switch installation.
Table 15: Site Preparation Checklist
Date
Performed By
For More Information
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet