Extreme networks 12804 Benutzerhandbuch

Seite von 160
Site Preparation
 
BlackDiamond 12800 Series Switches Hardware Installation Guide
42
Meeting power requirements
To run your equipment safely, you must meet the specific power requirements for each power 
supply unit installed in the system. For power supply specifications, see 
Meeting Site Requirements
This section addresses the various requirements to consider when preparing your installation site, 
including:
Operating Environment Requirements
Verify that your site meets all environmental and safety requirements. 
Virtually all areas of the United States are regulated by building codes and standards. During the early 
planning stages of installing or modifying your LAN, it is important that you develop a thorough 
understanding of the regulations that pertain to your location and industry. 
Building and Electrical Codes
Building and electrical codes vary depending on your location. Comply with all code specifications 
when planning your site and installing cable. The following sections are provided as a resource to 
obtain additional information.
Information about major building codes is located at the following websites:
International Code Council (ICC); 5203 Leesburg Pike; Falls Church, Virginia 22041 USA.
Five authorities on electrical codes are:
http://www.nfpa.org
 
http://www.ul.com
 
National Electrical Manufacturing Association (NEMA) (USA only)—an organization of electrical 
product manufacturers. Members develop consensus standards for cables, wiring, and electrical 
components. The address is NEMA; 1300 N. 17th Street; Rosslyn, Virginia 22209
 
Electronics Industries Alliance (EIA)—a trade association that develops technical standards, 
disseminates marketing data, and maintains contact with government agencies in matters relating to