Extreme networks 12804 Benutzerhandbuch

Seite von 160
Installing the BlackDiamond 12800 Series Chassis
 
BlackDiamond 12800 Series Switches Hardware Installation Guide
68
Figure 37: Securing the BlackDiamond 12802 Switch to the Rack (Mid-mount Position)
Grounding the BlackDiamond 12800 Series Chassis
Although grounding the BlackDiamond 12800 series chassis is optional, it is recommended. A 
grounding point with integrated pem-nuts is provided on the back of the chassis.
You need the following materials to ground the chassis:
Two 10-24 screws, 1 inch or shorter
One copper, standard barrel 2-hole compression grounding lug, type LDC, equivalent to Panduit 
part number LCD4-14A-L or Thomas & Betts part number: LCN4-14
Appropriate grounding wire for your system, based on the available input current for the power 
supply:
For AC systems using a 20A breaker per PSU (SSI AC), the chassis ground can be as small as 
14 AWG. 
For DC systems using a 40A breaker per PSU (SSI DC), the chassis ground can be as small as 
10 AWG. 
Rack
Screws (x4)
Screws
BD_152