LevelOne GSW-2476 Benutzerhandbuch

Seite von 108
T
WISTED
-P
AIR
 D
EVICES
4-3
Network Wiring Connections
Today, the punch-down block is an integral part of many of the newer 
equipment racks. It is actually part of the patch panel. Instructions for 
making connections in the wiring closet with this type of equipment 
follows.
1. Attach one end of a patch cable to an available port on the switch, and 
the other end to the patch panel.
2. If not already in place, attach one end of a cable segment to the back 
of the patch panel where the punch-down block is located, and the 
other end to a modular wall outlet.
3. Label the cables to simplify future troubleshooting. See “Cable 
Figure 4-2  Wiring Closet Connections 
Equipment Rack
(side view)
Network Switch
Patch Panel
Punch-Down Block
Wall
w it ch 10 /1 0 0
6 7 2 4 L 3
ES4524C
1
2
7
8
12
3
4
5
6
9
10
11
13 14 15 16 17 18 19 20 21 22 23 24
Link/Act
Link/Act
Power
1000
1000
1
2
3
4
13
14
15
16
5
6
7
8
17
18
19
20
9
10
11
12
21
22
23
24
21
22
23
24
o n e
level
GSW-2476 24 Port Gigabit w 4 Port SFP Web Smart Switch
-
/ -
Shared SFP Port