American Power Conversion AP9615 Benutzerhandbuch
5
Installing the Hub
Warning
Do not operate the 5 Port 10Base-T Hub where conditions
are outside the limits listed in “Product Specifications” on
page 14.
are outside the limits listed in “Product Specifications” on
page 14.
Installing on
critical systems
The installation procedure that follows may involve shut-
ting off power from the
ting off power from the
UPS
. However, if your setup
requires maintaining power to connected equipment
throughout installation, visit the support page on our Web-
site
(http://www.apcc.com/support/#kbase)
throughout installation, visit the support page on our Web-
site
(http://www.apcc.com/support/#kbase)
and follow the
appropriate procedure in Installation Instructions for
APC
Management Accessories on Critical Systems.
Installation
procedure
To install the 5 Port 10Base-T Hub, perform the following
steps in the order given.
steps in the order given.
Note: The Smart-
UPS
, Matrix-
UPS
, Symetra Power Array,
Smart-UPS DP, and Triple Chassis for Silcon require
different procedures to turn off the UPS or device that
will host the hub.
different procedures to turn off the UPS or device that
will host the hub.
1 To turn off the
UPS
or device that will host the hub,
follow the appropriate procedure listed below:
Smart-
UPS
®
a Shut down and power off the connected equip-
ment.
b Press and hold the UPS’s Power Off button
until you hear a click or until the UPS’s power
LED extinguishes.
LED extinguishes.
c Unplug the
UPS from the AC power outlet
.
d Press and hold the UPS’s Power Off button
until you hear a click (hold for at least 5 sec-
onds).
onds).
Continued on next page