FieldServer FS-X20 Benutzerhandbuch

Seite von 13
FS-X20 Series FieldServer Start-up Guide  
 
 
 
Table of Contents 
Table of Contents 
TABLE OF CONTENTS 
1.
 
PRE-INSTALLATION CHECK LIST ............................................................................... 2
 
1.1.
 
Supplied equipment ................................................................................................... 2
 
1.2.
 
Start-up...................................................................................................................... 2
 
2.
 
PRODUCT DESCRIPTION ............................................................................................. 3
 
2.1.
 
Specifications............................................................................................................. 3
 
2.2.
 
Mounting .................................................................................................................... 3
 
2.3.
 
Wiring ........................................................................................................................ 3
 
2.4.
 
Supplied Connector Kit (FS-8915-11) ........................................................................ 5
 
3.
 
OPERATION ................................................................................................................... 8
 
3.1.
 
Install and Run the Utility Software............................................................................. 8
 
3.2.
 
Use PING to Identify the FieldServer on the Network................................................. 8
 
3.3.
 
Connect using “Remote User Interface” (RUINET)..................................................... 8
 
3.4.
 
Use RUINET to change the FieldServer IP Address and Network.............................. 8
 
3.5.
 
Upload the Default Configuration ............................................................................... 8
 
3.6.
 
Change the Configuration File to Meet the Application............................................... 9
 
3.7.
 
Download the Updated Configuration File .................................................................. 9
 
3.8.
 
Test and commission the FieldServer ........................................................................ 9
 
APPENDIX A.
 
LIMITED WARRANTY ...................................................................................10
 
APPENDIX B.
 
LED FUNCTIONS ..........................................................................................11