Lucent Technologies 555-233-115 Benutzerhandbuch

Seite von 502
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r  
555-233-115  
Issue 1
April 2000
Adding or Removing Cabinet Hardware 
6-120
Add a Switch Node Carrier (High or Critical Reliability) 
6
Figure 6-43.
Critical-Reliability Fiber-Optic Connections through Center Stage Switch
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PORT CARRIER - J58890BB
CLOCK
CONTROL CARRIER - J58890AP
AUX
TERMINAL
CLOCK
CONTROL CARRIER - J58890AP
AUX
TERMINAL
FAN
FAN
FAN
SWITCH NODE CARRIER - J58890SA
21 20 19 18 17 16 15 14 13
9 8 7 6 5 4 3 2 1
POWER DISTRIBUTION
UNIT
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PORT CARRIER - J58890BB
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PORT CARRIER - J58890BB
EXPANSION CONTROL CARRIER - J58890AF
AUX TERM
19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
FAN
FAN
FAN
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PORT CARRIER - J58890BB
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PORT CARRIER - J58890BB
POWER DISTRIBUTION
UNIT
SWITCH NODE CARRIER - J58890SA
21 20 19 18 17 16 15 14 13
9 8 7 6 5 4 3 2 1
B
A
C
REAR VIEW
REAR VIEW
B
A
C
E
D
CABINET 1
PPN W/ONE DUPLEX SWITCH NODE
CABINET 2 THRU 16
EPN
E
D
TO CABINET 2 THRU 16, B2
TO CABINET 2 THRU 16, A1
TO CABINET 1, D3-D20
TO CABINET 1, E3-E20
BOTH CONNECTIONS FROM EACH
EPN MUST GO TO THE SAME
SLOT NUMBER (E.G. EPN
CABINET 2, 2A1 TO 1E3 AND
AND CABINET 2, 2B2 TO 1D3).
ADD IN ALTERNATING
ORDER: 20, 3, 19, 4,
18, 5, ETC.
ADD IN ALTERNATING
ORDER: 20, 3, 19, 4,
18, 5, ETC.
H600-278
H600-278
EI
EI