Whirlpool W10526072A Benutzerhandbuch

Seite von 16
5
A 120 volt, 60 Hz., AC only, 15-amp fused, electrical circuit is 
required. A time-delay fuse or circuit breaker is also 
recommended. It is recommended that a separate circuit 
serving only this oven be provided.
Electronic ignition systems operate within wide voltage limits, 
but proper grounding and polarity are necessary. Check that 
the outlet provides 120-volt power and is correctly grounded. 
The wiring diagram is located in the upper control 
compartment in a clear plastic bag.
Gas Supply Requirements
Observe all governing codes and ordinances. 
IMPORTANT: This installation must conform with all local codes 
and ordinances. In the absence of local codes, installation must 
conform with American National Standard, National Fuel Gas 
Code ANSI Z223.1 - latest edition or CAN/CGA B149 - latest 
edition. 
IMPORTANT: Leak testing of the oven must be conducted 
according to the manufacturer’s instructions.
Type of Gas 
Natural gas:
This oven is design-certified by CSA International for use with 
Natural gas or, after proper conversion, for use with LP gas. 
This oven is factory set for use with Natural gas. See “Gas 
Conversions” section. The model/serial rating plate located 
behind the broiler drawer on the right-hand side oven front 
frame has information on the types of gas that can be used. If 
the types of gas listed do not include the type of gas 
available, check with the local gas supplier.
LP gas conversion:
Conversion must be done by a qualified service technician.
No attempt shall be made to convert the appliance from the gas 
specified on the model/serial rating plate for use with a different 
gas without consulting the serving gas supplier. See “Gas 
Conversions” section.
Gas Supply Line 
Provide a gas supply line of ¾" (1.9 cm) rigid pipe to the oven 
location. A smaller size pipe on longer runs may result in 
insufficient gas supply. Pipe-joint compounds that resist the 
action of LP gas must be used. Do not use TEFLON
®†
 tape. 
With LP gas, piping or tubing size can be ½" (1.3 cm) 
minimum. Usually, LP gas suppliers determine the size and 
materials used in the system.
Flexible metal appliance connector:
If local codes permit, a new CSA design-certified, 4 to 5 ft 
(122 to 152.4 cm) long, ½" (1.3 cm) or ¾" (1.9 cm) I.D., 
flexible metal appliance connector may be used for 
connecting oven to the gas supply line. 
A ½" (1.3 cm) male pipe thread is needed for connection 
to the female pipe threads of the inlet to the appliance 
pressure regulator. 
Do not kink or damage the flexible metal tubing when 
moving the oven.
Rigid pipe connection: 
The rigid pipe connection requires a combination of pipe 
fittings to obtain an in-line connection to the oven. The rigid 
pipe must be level with the oven connection. All strains must 
be removed from the supply and fuel lines so oven will be 
level and in line.
Must include a shutoff valve: 
The supply line must be equipped with a manual shutoff 
valve. This valve should be located in the same room but 
external to the oven opening, such as an adjacent cabinet. It 
should be in a location that allows ease of opening and 
closing. Do not block access to shutoff valve. The valve is for 
turning on or shutting off gas to the oven.
WARNING
Explosion Hazard
Use a new CSA International approved gas supply line.
Install a shut-off valve.
Securely tighten all gas connections.
If connected to LP, have a qualified person make sure 
gas pressure does not exceed 14" (36 cm) water 
column. 
Examples of a qualified person include: 
licensed heating personnel, 
authorized gas company personnel, and
authorized service personnel.
Failure to do so can result in death, explosion, or fire.
A. Gas supply line
B. Shutoff valve “open” position
C. To range
†®TEFLON is a registered trademark of E.I. Du Pont De Nemours and Company.
A
B
C