Middleby Cooking Systems Group PS870 Series Benutzerhandbuch

Seite von 24
21
E.  Blower Belts
1.
To gain access to each blower belt compartment remove
the  four  screws  shown  in  Figure  4-8.  Then,  lift  the  rear
shroud  off  its  hangers.
If  access  to  the  blower  motors  is  required,  remove  the
three mounting screws (two on the front of each shroud
and one on the rear). Then, lift the end shroud straight up
and off its hangers.
2.
Check each blower belt for cracking or excessive wear.
3.
Check for amount of belt deflection in the center of the belt,
1/2
″ deflection is acceptable, see Figure 4-9.
4.
If necessary, replace belt.
IV. MAINTENANCE - EVERY 6 MONTHS
A.
Check that the oven is cool and the power is disconnected
as described in the warning at the beginning of this Section.
B.
For gas ovens, clean and inspect the burner nozzel and
electrode  assembly.
C.
Check (and clean, if necessary) the oven venting system.
D.
Check  the  conveyor  drive  shaft  bushings  and  spacers.
Replace the components if they are worn.
Figure 4-9 - Belt Deflection