Manitowoc Ice K00049 Benutzerhandbuch

Seite von 3
 
 
 K00049 STACKING KIT  
                                                  Installation Instructions 
 
These instructions are for stacking an E-0400, G-0400, or G-0600 ice machine on a G-1200 ice machine.  The bin must be 
level before proceeding. 
 
PARTS LIST: 
 
Item 
Description 
 
 
 
 
Qty. 
   
  P/N   
 1. 
Ice Chute Weldment 
 
 
 
  1 
   
6639714 
 2. 
Top Cover 
 
 
 
 
  1 
   
6870914 
 3. 
Water Shield 
 
 
 
 
  1 
   
6639814 
 4. 
Top Mounting Bracket   
 
       
  1 
   
6639914 
 5. 
Bottom Mounting Bracket 
 
 
  1 
   
6640014 
 6. 
Bin Thermostat   
 
 
 
  1 
   
6025014 
 7. 
Bin Thermostat Bulb Mounting Bracket      
  1 
   
6091314 
 8. 
Electrical Box Front Cover 
 
        
  1  
   
6207014 
 9. 
Tie Plate  
 
 
 
 
  1  
   
6273014 
10. 
Installation Instructions      
     
 
  1 
   
8003293 
11. 
Label - Wiring Diagram                    
 
  1 
   
8106243 
12. 
RTV Sealer (3 oz. tube)                   
  1 
   
9100691 
13. 
Foam Tape                        
 
 
114" 
   
9202483 
14. 
Screw #10-24 x 5/8" P.P.H.T.C.   
 
  5 
   
5202053 
15. 
Screw #10-24 x 3/8" Slotted Hex Hd. TCS 
  3 
   
5202103 
16. 
Screw #8 x 1/2" S.M.S.    
 
 
  1 
   
5121531 
17. 
Wing Nut #8-32         
 
 
 
  4 
   
5489021 
 
1.  INSTALLATION OF BIN THERMOSTAT BRACKET: 
A.  Locate the bin, as shown in Illustration 1. 
2.    INSTALLATION OF G-1200 ICE MACHINE: 
A.  See service manual for uncrating and inspection of ice machine. 
B.  Remove top cover from ice machine. 
C.  Set ice machine carefully and squarely on bin. 
D.  Position top cover from kit on right-hand side of ice machine.  Attach water shield from kit to top cover using one #8 x 
1/2" long sheet metal screw from kit (see Illustration 2). 
E.  Apply foam tape from kit, as shown in Illustration 2 
3.    INSTALLATION OF E-0400, G-0400, OR G-0600 ICE MACHINE: 
       NOTE:  G-0600 IS USED TO REPRESENT ANY E-0400, G-0400, OR G-0600. 
A.  See service manual for uncrating and inspection of ice machine. 
B.  Remove top cover from ice machine. 
C.  Position G-0600 ice machine on G-1200 ice machine with back and left sides being flush. 
 
Attach machines together using the tie plate from kit on left side of machines.  Remove the right side panel from the 
G-0600 ice machine.  Drill a 5/32" diameter hole in top cover using an existing hole in the bottom angle of the G-0600 
ice machine as a guide.  NOTE:  Be sure not to damage internal parts of the G-1200 ice machine (see Illustration 3). 
       D.  Before applying RTV sealant in designated areas to insure against leaks or water hang-ups (as shown in Illustration 4), 
remove the water pump, high and low valve plastic cover, water curtain, and water trough.  After sealing seams with 
RTV, replace water pump, water curtain, high and low valve plastic cover, and water trough. 
 
 
Manitowoc Ice, Inc.                                                                                                                                                          
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI  54221-1720 USA                                                                                                          8003293 
Telephone 920-682-0161, Fax - Sales:  920-683-7589, Service/Parts: 920-683-7585,  Other:  920-683-7879                                            Sheet 1 of 10 
Web Site - www.manitowocice.com                                                                                                                                                             Rev. 05/17/01 
4.     INSTALLATION OF BIN THERMOSTAT BULB: