Manitowoc Ice K00115 Merkblatt

Seite von 1
K00114/K00115 PANEL KIT 
                                                             Installation Instructions 
 
 
ATTENTION INSTALLER: 
 
1.  Before installing the new front panel, remove the insulation from the existing front panel and place it in the new front 
panel by tucking all four edges under the flanges on the back side of the panel. 
 
NOTE:  The louvers have been added to the new right and left-hand side panel to standardize this panel.  These 
louvers will not affect the operation of an ice machine with a remote condenser or a water-cooled condenser that 
previously did not have louvers in the right and left-hand side panel. 
 
2.  The air baffle must be installed on air-cooled machines only to prevent the condenser air from recirculating.  Install, 
as shown. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Manitowoc Ice, Inc.
 
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI  54221-1720 USA                                                                                                    8009063                        
Telephone 920-682-0161, Fax - Sales:  920-683-7589, Service/Parts: 920-683-7585,  Other:  920-683-7879                                     Rev. 12/09/97