 E-0600 STACKING KIT 
                                                 Installation Instructions 
 
1.  Installation of E-0600 Series Ice  Machine and Storage Bin: 
A.  Open bin carton, lay carton on its side, and remove cardboard liner from inside bin.  Place the liner on the floor in 
front of the carton and slide the bin onto the liner.  Attach four bin legs, set the bin upright, and check for damage.  
Move bin to the set-up location and level.  The legs are ad justable for leveling.  If the legs are not used, use shims 
to level the bin.  The NSF (National  Sanitation Foundation) requires that a bin not on legs m ust be sealed to the 
floor using mastic around the entire perimeter on the bottom of the bin. 
B.  See service manual for uncrating and inspection of both ice machines. 
C.  Remove the top cover from the lower ice machine. 
D.  Place the control bulb bracket on the back edge of bin, in the center (see FIG. 4). 
E.  Place cover from E-0600 kit on ice machine and replace screws.  Set ice machine on the bin squarely. 
F.  Remove front panel, top cover, and end panel from second ice machine. 
2.  Thermostat Control Installation (see FIG. 2): 
A.  Remove thermostat control from  E-0600 carton.   Locate control on partition panel, under tim er box and toggle 
switch.  Mark two hole locations on panel  using bracket holes as a guide.  Drill two 1/8” holes and m ount control 
to partition panel with two sheet metal screws. 
B.  Wiring Control (see FIG. 2 and FIG. 3). 
a. 
Remove white plug located on partition panel (ice  making compartment) underneath timer box and insert 
7/8” bushing from  kit.  Insert two wire 
leads  from  thermostat control through partition panel into com
pressor 
compartment.  Run leads up to and through smaller of the two bushings in partition panel and into timer box (see FIG. 
2). 
Remote and water m achines: See FIG. 2.  Air m achines: See FIG. 3.  Rem ove lead  wire marked #16 from 
toggle switch and connect to one lead from  thermostat with double quick-connect from  kit.  Connect other 
lead from thermostat to center quick-connect on toggle switch. 
C.  Place ice machine end panel and cover back on and set machine on top of first machine, carefully and squarely. 
D.  Remove the ice chutes and damper doors from upper and lower ice machines. 
E.  Remove the water curtain from the lower ice machine. 
F.  Pass the thermostat bulb through the ice chute opening in the upper machine (see FIG. 4). 
G.  Remove the screw on the bin switch housing and place a plas tic clamp on the thermostat tubing.  Put the housing 
screw through the clamp and replace screw and clamp to housing (see FIG. 4). 
H.  Remove the right-hand water curtain hanger screw and put  a plastic clam p on the therm ostat tubing.  Carefully 
bend the tubing back to the evaporator position.  Mount the clamp and curtain hanger back to original position. 
I.  Remove the right-hand harvest rack bracket screw and pl ace a plastic clamp on the thermostat tubing.  Put screw 
through clamp and mount clamp to the harvest rack. 
J.  Feed the tubing through the right-hand corner of the ice chute opening.  Carefully bend the tubing straight back to 
the bin wall and then over to the plastic clam p on the br acket.  Slide the bulb into the clam p on the bracket and 
tighten the screws.  Place a plastic clam p over the tubing and attach to the base of the  machine with a sheet metal 
screw. 
K.  Replace the lower ice m achine water curtain.  Make sure  the curtain can open and close freely  without hitting on 
the control tubing.  If the curtain does hit the tubing, bend tubing enough to allow the curtain to pass. 
3.   Installation of Stacking Kit Ice Chutes (see FIG. 5 and 6): 
A.  Remove the water pum p from the lower ice m achine.  Take the water pum p and slide it up and off the  mounting 
studs.  Rem ove electrical plug from  socket.   Lift  the pump out of the water trough and disconnect the plastic 
tubing.  Reverse these steps for later installation. 
B.  Place ice chute “A” in lower ice chute opening in base. 
 
 
Manitowoc Ice, Inc.                                                                                                                                                            
2110 South 26 Street, P.O. Box 1720, Manitowoc, WI  54221-1720 USA                                                                                                         8000893 
Telephone 920-682-0161, Fax - Sales:  920-683-7589, Service/Parts: 920-683-7585,  Other:  920-683-7879                                             Sheet 1 of 2 
Web Site - 
www.manitowocice.com
                                                                                                                             
Rev. 06/06/01
 
C.  Make sure the bin control tube has clearance between the base opening and ice chute.