Amana HRV-150 Benutzerhandbuch

Seite von 28
1
Heat Recovery
Ventilators
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
HRV-150 • HRV-150D
HRV-200 • HRV-200D • HRV-300D
Your ventilation system should be installed in conformance with the appropriate provincial or state requirements or in the absence
of such requirements with the current edition of the National Building Code, and / or ASHRAE’s “ Good Engineering Practices”.
IMPORTANT - PLEASE READ THIS MANUAL BEFORE INSTALLING UNIT
CAUTION - 
Before installation, careful consideration must be given to how this system will operate if connected to any other piece of mechanical equip-
ment, i.e. a forced air furnace or air handler, operating at a higher static. After installation, the compatibility of the two pieces of equipment must be confirmed
by measuring the airflow’s of the Heat Recovery or Energy Recovery Ventilators by using the balancing procedure found in this manual.
It is always important to assess how the operation of any HRV/ERV may interact with vented combustion equipment (i.e. Gas Furnaces, Oil Furnaces, Wood
Stoves, etc.).
NEVER - 
install a ventilator in a situation where its normal operation, lack of operation or partial failure may result in the backdrafting or improper function-
ing of vented combustion equipment!!!
Goodman is a registered trademark of Goodman Company, L.P.
Amana is a registered trademark of Maytag Corporation and used under license to Goodman Company, L..P.  
All rights reserved.