Frigidaire EI30WC60GS Benutzerhandbuch

Seite von 21
12
12
12
12
12
Connecting the ductwork
Connecting the ductwork
Connecting the ductwork
Connecting the ductwork
Connecting the ductwork
• Install ductwork, making connections in the
direction of airflow as illustrated.
• Push duct over the exhaust outlet.
• Wrap all duct joints and the flange connections
with duct tape for an airtight seal.
• Make the same connection in the wall or ceiling
vent exit.
Duct tape
over seam
Airflow
Installing the hood
Air deflector installation
Air deflector installation
Air deflector installation
Air deflector installation
Air deflector installation
(Recir
(Recir
(Recir
(Recir
(Recirculating accessories)
culating accessories)
culating accessories)
culating accessories)
culating accessories)
• Assemble the air deflector with the duct cover
bracket with 4 assembly screws provided as
shown.
• Measure from the bottom of the air deflector to
the bottom of the hood outlet, as shown.
Dimension to measure
• Cut the duct at the measured size.
• Uninstall the air deflector removing the 4
assembly screws.
• Slip the duct onto the bottom of the deflector.
• Place the assembled deflector and duct over the
exhaust outlet from the hood.
• Assemble the air deflector to the duct cover
bracket with 4 assembly screws provided as
shown.