GE ZV421 Benutzerhandbuch
18
STEP 13 INSTALL SUPPLIED DUCT
COVER AND TOP COVER
STEP 14 FINALIZE INSTALLATION
• Check all lamps to assure tightness in sockets.
• Turn power on at the circuit breaker.
• Refer to the Owner’s Manual for operating and
• Turn power on at the circuit breaker.
• Refer to the Owner’s Manual for operating and
cleaning instructions.
• Engage tabs into slots on each side at the top of the
hood. The covers should lay flat in the impression on
top of the hood.
top of the hood.
Installation Instructions
• Install 2 Screws C to secure the cover to the hood at
the front and back.
• Install the supplied 2-piece duct cover over the
support frame (if using supplied frame). Snap ends
together.
together.
• Secure duct covers to support frame with 2
Screws D.
• For a more finished appearance, a top cover is
supplied and should be installed whenever the top of
the hood is visible.
the hood is visible.
Screws D
Tabs
Tape
Screws C
Top Cover
Install Screws
Front and Back
Install Duct
Cover Screw
on Each Side
TIP: Place pieces
of tape over ends
of the cover to
prevent scratching
the duct cover.
Remove tape
before installing
screws.
of tape over ends
of the cover to
prevent scratching
the duct cover.
Remove tape
before installing
screws.