York YK-ZCU2x0-0 Benutzerhandbuch

Seite von 96
System Manager/Zone Coordinator User’s Manual
60
428516-YUM-B-0908
Zone Setup Procedures
Zone setup procedures include:
Setting up a zone
Editing zone name
Viewing zone status
Copying zone setup to all zones
Requesting global shutdown of all zones
Viewing device diagnostics for a zone
Figure 41 is a flowchart of the menu structure that is used to set up zones on the Sys-
tem Manager. These menu selections are described in the sections that follow. 
Figure 41: Zone Setup Options - Menu Structure
Coordinator Setup 
and Status
Zone 
Coordinator
FI
G:Z
n
eS
y
sSt
u
p
Fl
w
Setup
Systems
Instant
Shutdown
System
Status
Zoning System
Status
Setup
•  Control Mode
•  Discharge Cooling Setpoint
•  Discharge Heating Setpoint
•  Min Number of Requests to 
Change Mode
•  Min Number of Urgent Requests 
to Change Mode
•  Min Time Before Changeover
•  Number of Cooling Stages
•  Number of Heating Stages
•  Static Pressure Setpoint
Balance System
•  Control Mode
•  Discharge Air Temp Setpoint
•  Discharge Air Temp Strategy
•  Duct Static Setpoint
•  Duct Static Setpoint Reset
•  Duct Static Shutdown Limit
•  Econ Damper Position for Exhaust Fan On
•  Econ Damper Position for Exhaust Fan On
•  Economizer Min Position
•  Max DAT Setpoint Adjust
•  Max Duct Static Setpoint Adjust
•  Morning Warm-up
•  Morning Warm-up Return Air Setpoint
•  Representative Zone
•  Unoccupied Heating/Cooling
CV/COB RTU
VAV RTU
CV RTU