ZERO CLEARANCE BOX ASSEMBLY; 
 
First take the kit from the box and place the surround panels aside so as not to damage the panels. There will also be a bag of screws, nuts 
and bolts in the box. The bottom section of the kit will have two 3 inch square boxes mounted to the bottom. First attach the bottom to the 
back with the screws provided, the hole should be located in the 
lower right hand corner looking at it from the front. The side can then 
be mounted to the bottom panel and the back panel. There are three 
(3) vee shaped standoffs with six screw holes in each, and they 
should be mounted on both sides as well as the back. There are also 
two (2) triangular support brackets that must be fastened to the inside 
of the box. There is a right hand and a left hand bracket, they should 
be mounted with the flanges pointing upwards. 
 
There are two long “L” shaped framing brackets that are screwed in 
from the outside front edge of each side. Each bracket has three 
adjustment holes depending on the thickness of the finished wall. The 
hole that is furthest forward are for a wall thickness of 1/2” drywall 
and the other holes are for other wall thickness up to 7/8” thick. The 
Zero Clearance kit must be flush with the finished wall.  
 
The next step  is to put the top on the box. It will fit inside of the back 
and side panels and is screwed in from the outside. The two short 
vee shaped standoffs are screwed on to the top of the zero clearance kit. There are two large “L” type brackets that are to be screwed 
down on either side of the hole were the flue pipe exits the box. These two brackets are to locate the clamping bracket that holds the 
Simpson Duravent Telescoping pipe and allows the 828 unit to be disconnected and 
removed if the unit needs to be repaired. 
 
The next step is to attach the top extension to the Zero Clearance box. This is screwed 
to the top front edge. The top framing bracket is in turn screwed to the top extension. 
This top framing bracket has the same adjustment settings as the side framing 
brackets. 
 
Once the Zero Clearance box has been assembled it can be attached to the wall. 
Place the unit into the framed opening and make sure the box is plumb and level. 
 
The gas line then should be run through one of the three holes provided. The electrical 
cord and conduit (if a fan is to be installed) should also be run into the box at this time. 
The electrical box that is supplied with the fan kit will be mounted on the side, there 
are two holes inside the Zero Clearance box for mounting. 
 
The venting is the next step of installation. The pipe support on the top of the Zero 
Clearance kit is made to hold the telescoping pipe section. The clamp should be 
fastened 2” down from the top of the male end of the pipe. 
This will allow the top of the pipe to be held in place while 
the bottom section of pipe is attached to the stove. 
 
The wall can now be finished with drywall and mantel if so 
desired. 
 
Installing the 828 direct vent insert. The unit can be lifted 
up and put on the two support boxes on the bottom of the 
box and then pushed back into the box. There are two 
holes that must line up from the triangular supports inside 
the Zero Clearance box to the holes on the inserts side 
panel brackets and attached with the two screws provided. 
The vent pipe should then be connected to the top of the 
fireplace as well as the gas and electrical connections. The 
vented skirt can now be mounted to the bottom of the unit 
with the two 10 x 24 hex head screws provided, inserted 
into. The surround panel can now be assembled and 
bolted to the front of the stove. 
 
 