SECTION 4 - MAINTENANCE
2.
Remove  the  master  links  from  each  conveyor  belt.
Then, roll the belts up along the length of the conveyor
to remove them from the frame.
3.
Remove the two conveyor adjustment screws from the
idler end of the conveyor frame, as shown in Figure 4-
4.
4.
Remove the idler shaft assembly from the conveyor.
5.
Pull apart the two sections of the idler shaft.
6.
Clean the shafts thoroughly using a rag.  Then, lubri-
cate  both  the  extended  shaft  and  the  interior  of  the
hollow  shaft  using  a  light  food-grade  lubricant. DO
NOT  lubricate  the  shafts  using  WD40  or  a  similar
product.  This can cause the shafts to wear rapidly.
7.
Before  reassembling  the  shafts  into  the  conveyor
frame, check that they are oriented properly.
8.
Reassemble the idler shaft into the conveyor.  Make
sure that the bronze washer is in place between the
two sections of the shaft.  See Figure 4-4.
9.
Replace the conveyor adjustment screws as shown in
Figure 4-4.  To allow the conveyor belt to be reinstalled
later, do not tighten the screws at this time.
10. Loosen  the  set  screw  on  both  of  the  conveyor  drive
sprockets.  Then, remove the sprockets from the shaft.
11. Check the conveyor configuration as follows:
High-speed  conveyors  are  equipped  with  large
flange  bearings  at  both  ends  of  the  shaft,  as
shown  in  Figure  4-5.    For  these  conveyors,  re-
move the two screws that hold each bearing to the
conveyor frame.  With the screws removed, lift the
end of the shaft at the front of the oven, and pull the
entire assembly free of the conveyor frame.
Standard  conveyors  are  equipped  with  bronze
bushings mounted on spacers at both ends of the
shaft, as shown in Figure 4-5.  For these convey-
ors, remove the two screws that hold the bracket
to the conveyor frame.  With the screws removed,
lift the end of the shaft at the front of the oven, and
pull  the  entire  assembly  free  of  the  conveyor
frame.  The brackets will be removed along with
the drive shaft assembly.
12. Disassemble  and  lubricate  the  two  sections  of  the
drive shaft as described for the idler shaft, above.
13. Before  reassembling  the  shafts  into  the  conveyor
frame, check that they are oriented properly.
14. Reassemble the drive shaft into the conveyor.  Make
sure that the bronze washer is in place between the
two sections of the shaft.  See Figure 4-6.
15. Replace  the  drive  sprockets.    Reassemble  the  belts
and master links onto the conveyor.
16. Reinstall the end plugs and conveyor onto the oven.
17. Reattach the drive chains.  Replace the chain cover.
18 Check  the  tension  of  the  conveyor  belt  as  shown  in
Figure 2-11 (in Section 2, Installation).  The belt should
lift  about  1"  (25mm).    If  necessary,  adjust  the  belt
tension  by  turning  the  conveyor  adjustment  screws.
19. Replace all components onto the oven.
Figure 4-5 - Drive shaft configurations
Figure 4-4 - Disassembling the idler shaft
Remove
adjustment
screws
Bronze
washer
Disassemble,
clean, and
lubricate  shafts
Remove
idler
shaft
assembly
Figure 4-6 - Disassembling the drive shaft
Loosen set
screws and
remove  drive
sprockets
Remove 2 screws and nuts per
side to free bearings/brackets
Flange bearing
shown (used with
high-speed
conveyors)
Disassemble,
clean, and
lubricate  shafts
Flange bearing
(used with high-
speed  conveyors)
Bronze bushing with