Whirlpool 318686-000 Benutzerhandbuch

Seite von 24
13
Smart Grid Technology
The electric Smart Grid will enable signifi cant improvements in electric power reliability and quality through reduction of 
peak power demand, while providing consumers the knowledge and ability to manage their energy consumption and utility 
costs.
According to the Department of Energy (DOE), since 
1982 the growth in peak electricity demand has 
exceeded power transmission growth. This has caused 
more frequent blackouts and service interruptions, as 
well as an increase in the costly reserve capacity the 
power grid requires to meet higher peak demands. 
The increased demand for electrical power across the 
nation has also led to higher peak utility costs. 
Smart appliances are one way to help mitigate this 
problem. By using advanced digital communication 
technologies, smart appliances will be able to 
communicate with local power company or home 
energy management systems, and react accordingly 
to save energy and money. For example, during peak 
demand periods the water heater may pause or delay 
its power consumption and thus reduce the load on the 
smart utility grid. Additionally, smart appliances will also 
communicate with consumers to let them know how 
much energy they are consuming. This will eventually 
allow consumers to control their appliances, manage 
energy usage, and to ultimately save money.
Smart Grid Control
(Where Available)
Where available, Grid Communication Adaptors may be 
supplied by the local power company or purchased from 
leading retailers. Please contact your local power com-
pany for more information.
 
To activate Smart
 
Grid Control, remove the cover over 
the grid connection pins and plug in the grid communica-
tion adaptor. See Figure 10C. NOTE: use only Whirlpool 
- approved grid communication adaptors. This will enable 
the power company to communicate the peak demand 
periods for the water heater’s power usage.
 
       After this connection has been made, simply  
 
       press the “Grid Enabled” button to enable and/ 
 
       or disable a request for grid control. See Figure  
 
       10D. Enabling this feature will allow acceptance  
of the power company communication of grid manage-
ment requests. Disabling this feature will allow the water 
heater to ignore grid management requests.
NOTE: Smart Grid will be disabled when the Energy 
Smart
®
 Module (ESM) is disconnected from the junction 
box wiring harness (see page 12). 
Figure 10D
Smart Grid Control
°F/°C
GRID
ENABLED
VACATION
STANDARD
ENERGY
SMART
Pressing this button will enable 
and/or disable a request for
Smart Grid Control
F
LOCK
GRID
Figure 10C
Smart Grid Connection
Grid Connection
Pins
Junction Box
Grid Communication Adaptor
(May Be Supplied By Power Company)
(May Differ in Appearance)
Electric Shock Hazard
Disconnect power before 
servicing.
Replace all parts and panels
before operating.
Failure to do so can result in 
death or electric shock.
WARNING