Bunn Ultra-1 Bedienungsanleitung

Seite von 38
31
AUTO-FILL SET UP INSTRUCTIONS (ULTRA-2 Models only)
1.  Remove right side panel.
4.  Install snap clamps on hoses, 
just above the bushings to pre-
vent hoses from being pulled 
loose from the solenoid valves.
2.  Remove hole plugs in bottom 
of machine to route hoses to 
valves.
3.  Connect and properly clamp 
supply product and water lines 
from Brix pumps. Ensure that 
all connections are made to 
the correct valve for the right 
or left hopper. All valves are 
labeled to help with this pro-
cess.
5.  Route the tubes from the sole-
noids up to the quicck discon-
nect fittings on the hoppers. 
The tubes are supplied with 
extra length to allow for trim-
ming if desired. Slip a clamp 
over the end of the tube and 
install a .25" male disconnect 
fitting. Position the clamp over 
the barb area of the fitting and 
crimp into place.
NOTE: Make certain the tubes are 
routed to the correct hoppers tp 
prevent product from being mixed 
or hoppers overflowing. Connect 
the tubes to the hoppers.
7.  Install hopper level probe onto 
hopper.
6.  Connect the tubes to the hop-
pers.
(Continued next page)
40563 110207