HP 465c 539794-B21 Datenbogen
Produktcode
539794-B21
Every business faces challenges
Escalating costs: The goal of every IT department is to
provide reliable IT service delivery to the business at
the lowest possible cost. However the operating costs
of traditional IT infrastructures can make up a high
percentage of the total spend on IT, constraining the
ability to lower over-all computing costs.
provide reliable IT service delivery to the business at
the lowest possible cost. However the operating costs
of traditional IT infrastructures can make up a high
percentage of the total spend on IT, constraining the
ability to lower over-all computing costs.
Constant change: One of the biggest barriers to
change in the typical data center is the manual
coordination required across multiple groups to
synchronize internal processes. The hard-wired and
static design of IT infrastructures forces manual,
one-to-one IT practices. Ultimately, process speed
depends on how many people must be involved. A
30-minute task is not done in 30 minutes, if multiple
people and three days are needed to schedule and
execute it.
change in the typical data center is the manual
coordination required across multiple groups to
synchronize internal processes. The hard-wired and
static design of IT infrastructures forces manual,
one-to-one IT practices. Ultimately, process speed
depends on how many people must be involved. A
30-minute task is not done in 30 minutes, if multiple
people and three days are needed to schedule and
execute it.
Growing power and cooling needs: As data center
electricity bills soar, the cost of powering a server
over three years threatens to outstrip its acquisition
cost. At the same time, servers grow denser and
hotter, drawing more power and requiring more
air conditioning to cool. Today, many data centers
are constrained by their limited power and cooling
resources, threatening their ability to grow to meet
business needs.
electricity bills soar, the cost of powering a server
over three years threatens to outstrip its acquisition
cost. At the same time, servers grow denser and
hotter, drawing more power and requiring more
air conditioning to cool. Today, many data centers
are constrained by their limited power and cooling
resources, threatening their ability to grow to meet
business needs.
Time-consuming processes: Low productivity
and down time in the average data center waste
millions of dollars per week. To reach better
device-to-administrator ratios, each step, task, and
process must be simplified to reach higher levels of
efficiency and flexibility.
and down time in the average data center waste
millions of dollars per week. To reach better
device-to-administrator ratios, each step, task, and
process must be simplified to reach higher levels of
efficiency and flexibility.
HP ProLiant BL465c G6 Server Blade
Data Sheet
The HP ProLiant BL465c G6 delivers uncompromising performance
and expandability, industry-leading management tools, and the
latest technologies for dense compute environments. HP offers
powerful, reliable server blades with the same trusted features as
award-winning HP rack and tower servers. With features equal to
standard 1U rack mount servers, the two-processor BL465c G6
combines energy-efficient compute power and high density with
expanded memory and I/O for improved performance. A balanced
architecture featuring Six-Core AMD Opteron™ processors with
DDR2 memory, serial hard-drives, support for Multifunction Gigabit
networking, and multiple I/O cards provides a performance system
ideal for a full range of applications. In this small form factor, the
BL465c G6 includes features to provide high availability such as hot
plug hard drives, memory interleaving, embedded RAID capability,
and enhanced remote Lights-Out management.