Enterasys csx150 Anleitung Für Quick Setup

Seite von 49
B
ASICS
 
Once your cabling is complete, power on the CyberSWITCH simply by plugging its power cord 
into an electrical outlet. During the powering on sequence, the CyberSWITCH’s LED indicators 
provide valuable information. We provide you with instructions for “reading” the LED indicators.
After powering on, but before putting the CyberSWITCH into normal operation, we recommend 
that you read the Release Notes for important information. 
R
EADING
 
THE
 LED I
NDICATORS
Refer to the following graphic for locating specific LED indicators:
During the CyberSWITCH’s power on sequence, you should see the following:
1.
After plugging the CyberSWITCH in, the power indicator will light up and stay lit.
2.
The service indicator will light up for the duration of the initialization tests. It will then blink if 
there is a problem. For example, it will blink if your LAN is not properly terminated. For 
further information, refer to 
.
3.
The RX indicator blinks during port testing.
4.
If you are using a 10BaseT connection, the 10BaseT indicator will light up if the connection is 
good.
5.
The SYNC indicator will light up if layer 1 comes up.
6.
The D-CHAN indicator will light up if the data link comes up.
7.
After power on is complete, check the log messages (issue the 
dr
 console command) for any 
warning or error messages.
A
CCESSING
 
THE
 R
ELEASE
 N
OTES
The Release Notes provide release highlights and important information related to this release that 
should be reviewed before you begin the system’s installation and configuration.
The Release Notes are located on the CD