Enterasys D2G124-12P Installationsanweisungen

Seite von 76
Mounting the Switch
Enterasys D-Series Hardware Installation Guide 2-15
8.
Plug the DC power cord from the power supply into the switch DC power receptacle that is 
appropriate for your type of power supply.
For the D2‐PWR supply, plug into the PWR1‐A or PWR2‐A receptacle.
For the D2‐PWR‐POE supply, plug into the PWR1‐B or PWR2‐B receptacle.
For the D2‐HIPWR‐POE power combiner, see “
9.
Plug the AC cord into the power supply’s AC receptacle.
10. (Optional) Use the wire ties provided to secure the power cords inside the wall mounting tray.
11. Using appropriate screws and the screw holes in each corner edge of the wall mounting tray, 
attach the assembled kit to your desired wall location. Secure the assembled unit in place by 
positioning the screw holes over the installed wall screws and pulling slightly downward on 
the unit.
12. Attach network cables. Refer to “
information.
13. Plug each AC power cord into a dedicated, grounded AC outlet. See 
” on page 2‐26 for information on redundancy and the initialization process.
14. (Optional) If you have purchased an optional plastic cover, attach it to the mounted D2 switch 
as described in 
Installing the Switch in the Lockbox and Mounting on a Wall
To assemble the switch and other components in the D2 lockbox, proceed as described in the 
following sections:
Install your power supplies, following the steps in either “
Installing the Switch in the Lockbox 
To install the switch in the lockbox tray, proceed as follows:
1.
Detach the lockbox key and place it in a secure location for later use.
Note: Once assembled, the serial number on the bottom of your D2 switch will be accessible 
through the window on the bottom of the wall mounting tray. In the event you need to view it, you will 
need to detach the wall mounting tray from the wall and (if installed) remove the power supply from 
underneath the serial number window.