Enterasys a2h124-24 Installationsanweisungen

Seite von 62
Rack Mount Kit Installation
RoamAbout R2 Wireless Access Platform Hardware Installation Guide 2-5
Rack Mount Kit Installation
The rack mount kit allows you to install up to three remote power injectors into one 
standard rack-mount panel, shown below, to provide for the operation of up to three 
RoamAbout R2s.
The information presented in th
to each of the three remote power injectors in the rack mount kit. 
To install the rack mount kit, perform the following steps.
1.
Use a cable tester to check the cable wiring to each RoamAbout R2. Check the 
continuity and pairing.
2.
Select a mounting location:
Close to the Ethernet wiring panel.
Within six feet of an AC power outlet (if remote power is used).
3.
Use the screws provided in the rack mount kit to secure each remote power injector to 
the rack mount panel.
You can install up to three remote power injectors within the rack mount panel.
4.
Secure the rack mount panel to the rack using the screws provided in the kit.
5.
Insert an Ethernet cable connector into the network jack of one of the remote power 
injectors.
6.
Insert the RoamAbout R2 cable connector into the RoamAbout AP jack of the same 
remote power injector.
7.
Repeat Steps 5 and 6 for each RoamAbout R2.
8.
Proceed to