Enterasys 6000 Benutzerhandbuch

Seite von 38
Chapter 3: 6C105 Setup
3-6
6C105 Overview and Setup Guide
3.2.5
Installing a Power Supply Module
You must install at least one power supply in the 6C105 chassis. One 
power supply provides sufficient power for most module configurations 
but a second power supply can be installed to provide a redundant, load 
sharing power source. When two power supplies are installed, the load is 
evenly distributed. If one power supply fails for any reason, the second 
power supply assumes the load.
The 6C105 power supplies must be installed in the two slots labeled PS1 
and PS2 on the far right side of the chassis (
install a single power supply it must be installed in the slot labeled PS1 in 
the chassis. A flat blade screwdriver is needed to install the power supply 
module(s).
To install the power supply(ies) into the 6C105 chassis, refer to 
 and proceed as follows:
1.
Unpack the power supply by removing it from the shipping box and 
sliding the two foam end caps off the unit. (Save the shipping box and 
materials in the event the unit must be reshipped.)
2.
Remove the power supply from its protective plastic bag. (Save the 
shipping box and materials in the event the unit must be reshipped.)
3.
Examine the power supply carefully, checking for damage. If any 
damage is noted, DO NOT install the power supply. Contact the 
Cabletron Systems Global Call Center immediately.
!
CAUTION
If the 6C105 is configured with a single power supply module, it 
must be located in slot PS1.