Enterasys 6e128-26 Betriebsanweisung

Seite von 180
Completing the Installation
6E128-26, 6E138-25, 6E129-26 and 6E139-25 User’s Guide
3-11
a.
Check that the power is turned on for the device at the other end of 
the link.
b.
Verify proper crossing over of fiber strands between the 
applicable port on the 6E12X-26 and the fiber optic device at the 
other end of the fiber optic link segment.
c.
Verify that the fiber connection meets the dB loss specifications 
outlined in 
.
If a link has not been established, contact Cabletron Systems Global Call 
Center. Refer to 
3.7
COMPLETING THE INSTALLATION
The 6E12X-26 and 6E13X-25 are now ready to be set up through Local 
Management. Refer to 
modules and 6C105 chassis.
NOTE
The port RX LED flashes green and amber during bootup.