Enterasys vh-8tx1mf Benutzerhandbuch

Seite von 54
20  Installation
VH-8TX1UM/VH-8TX1MF
Powering the Switch
To supply power to the switch, connect the power cord to the switch and 
to a grounded three-prong wall outlet (Figure 2-3). See Appendix A, 
“Technical Specifications” on page 25 for more information regarding 
specific international power cord requirements. 
Figure 2-3.  Connecting the Power Cord
The Power LED lights green (see Figure 1-1). If it does not, check to make 
sure that the power cable is plugged in correctly and that the power 
source is good.
When power is applied, the switch conducts a series of hardware and 
software tests to verify operation. If a terminal or computer is connected 
to the console port, the results of the tests are displayed on the screen. If 
you want to display the results of the tests after the switch has been 
turned on, turn the power to the switch off then back on.
The switch performs two basic types of tests at power-up. During this 
time, all the LEDs light in sequence. These tests are:
Serial port
The serial console port test is the first test. If the switch fails, no 
further tests are performed and the console displays no information. 
Memory
Memory tests on the CPU RAM are performed after the serial port 
test. No results are displayed on the console.
After these tests are performed, the system initialization screen provides 
the option of starting the operational software of the switch or performing 
an XMODEM download to upgrade system firmware. When the 
operational software is started, the system is functional and the user 
interface is ready to receive commands at the console.