Enterasys vh-8g-l3 Benutzerhandbuch

Seite von 41
 
9033705-01 
22
 
 
 
Figure 2-2B.  Installing the Switch on an equipment rack 
Power on 
The VH-8G-L3 can be used with AC power supply 100-240 
VAC, 50 - 60 Hz. Simply connect the power cord to the AC 
power connector located on the rear panel of the Switch and 
to AC power outlet. The Switch’s power supply will then 
adjust to the local power source automatically and may be 
started without having any or all LAN segment cables 
connected. 
After the AC power is connected, the LED indicators should 
respond as follows: 
•  The Power LED indicator will remain steady while the 
Switch loads onboard software and performs a self-
test.  
•  When linked with the redundant power supply, the 
“RDP in use” LED will blink orange. 
Power Failure 
As a precaution in the event of a power failure, unplug the 
Switch. When power is resumed, plug the Switch back in.