Cleveland ogb-10.10 Zusätzliches Handbuch

Seite von 101
f
  The heat circuit will remain energized until the cabinet set temperature is reached
g
  When the condensate box is heated to 140 degrees F at the B3probe, 120 VAC is
sent from terminal 5 of connector X12 to the condenser valve (Y1) until the
temperature drops.
h
  If the “Crisp and Tasty” mode is selected
  120 VAC is sent from terminal 6 of connector X12 on the Control Board
(A10) to the Dehumidification Valve (Y2) to pull the humidity out of the
cabinet down the drain.
  In the light and medium modes (one and two drops in the display) the Y2
valve will be energized until the bypass probe (B5) is satisfied.
  In the full mode (3 drops in the display) the Y2 valve will be energized
continuously.
i
  When the timer counts to 0 or the core temp probe (B10) reaches the set amount
the cycle ends and the steam generator reverts to the standby temperature of 190-
degree F.
5
  With the combi in the Combi mode with time on the timer, the door closed and the
start switch is depressed
a
  The front display will include a lighted bar under the Combi symbol
  When the heat circuit is energized the heat symbol will be energized
  The cooking mode symbol will be energized.
  The time display will invert and begin to count down.
b
  The fan circuit is energized by the Control Board (A10) transmitting and
receiving a signal from terminals 5,6,7 and 8 on connector X10 to terminals 3,4,5
and 6 of connector X28 on the Gas Board (A20)
c
  The Gas board (A20) Transmits a signal from terminal 4 of connector X26 to the
Motor Drive.
  The motor Drive Board sends a signal through the thermal switch in the motor
from Terminal 5 and receives on terminal 6 
  If the thermal switch is not open the Motor Drive Board (U10) sends 220
VAC 3 phase to the motor.
  The motor reverses direction every 120 seconds with a 15 second coast.
  NOTE:  If the set temperature is less than 212 degrees F than fan will be
pulsed on for 2 seconds every 60 seconds after the cabinet set temp (B6). 
d
  The steam generator heat circuit is energized. Steam production takes precedence
in the Combi mode
  A signal is sent from terminal 8 of connector X24 on the Gas Board (A20) to
terminal 4 of connector X2 on the Steam Power Burner and Fan Control
(U21) selecting the set speed of the combustion blower.
70