Hussmann rl Installationsanweisungen

Seite von 7
Joining Instruction for
Medium Temperature
Single Deck Wall and 
Wide Island Merchandisers 
1
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483  U.S.A.
Merchandisers
®
For Medium Temperature Merchandisers
PARTS LIST
Item
Quantity
Description
Wall
Island
1.
1
1
Gasket  
1
/
2
1
/
2
x 120
2.
1
0
Gasket  
1
/
2
x  1
5
/
8
x 180
3.
4
5
Cap Screw  
5
/
16
-18 x 1
1
/
4
4.
5
7
Flat Washer  
5
/
16
5.
4
5
Lock Washer  
5
/
16
6.
1
2
Hex Nut  
5
/
16
-18
7.
1
1
Silicone
8.
1
4
Butyl Tape
9
1
2
Splashguard Joint Support
10.
4
8
Screw, Hex Head SM #8 x 
1
/
2
Note: Nut retainers are factory installed in the left end, and alignment pins are factory installed 
in the right end of merchandiser.
NOTE: Be sure merchandisers
have been leveled according to the
installation instructions to assure
good fit and finish of the lineup. Be
sure factory-installed nut retainers
and alignment pins are in place.
1
Remove shelves (if installed),
display racks, pans, front shelf
supports and front air grilles
from the right end as shown in
Figure 1. 
Remove and discard shipping
braces and associated hardware.
PW, PWW, PWR, MWG
M1E/M1GE
Removable Front
Shelf Supports 
Removable
Return
Air Grilles
P/N 0376452D
January, 2003
Figure 1. Removing Shelf Supports and Return Air Grilles