Cavalry cand3001t0 Zusätzliches Handbuch

Seite von 44
After initial setup, your connected network should follow a form similar to this:  
Power ON/OFF Procedure  
Always connect the power adapter to your device prior to inserting into electrical outlet. To 
turn on the power, press the ON/OFF switch. The blue backlight LED will illuminate and the 
unit will begin to boot up. About 2 minutes is required for the drive to be ready. During boot 
up, the Link LED will be blinking.  
To turn off the NAS, stop all current downloads and transfers, then turn off the power using 
the ON/OFF switch. It will take about 1 minute for the drive to park. If the system will be off 
for an extended period of time, remember to also remove the power supply from the electrical 
outlet.  
Alternatively, the device can also be turned off using the admin interface via web browser. 
First login, then go to the “Turn off Server” menu in the System area and turn the server off.
Quick Installation Guide  
1. Install either one or two hard drives.  
 
2. Connect the Ethernet cable from your network router/switch to the NAS.  
 
3. After everything is connected, turn on the NAS and wait about 2 minutes for boot up.  
 
4. Access the web configuration interface via your web browser. See “How to login” in the 
section below.  
 
5. Go to the Maintenance menu and use the disk utility to format the drive. If two identical 
drives are installed (as is factory default), you may go to the RAID setting section and create a 
RAID array. Do not perform any other functions while formatting and configuring RAID.